Environmental Clearance


The information on the projects accorded environmental clearance is given below :

Sector : Industrial Projects

Sl. No.

Name of Projects

Proponent

Location

Authority and Date of Approval

Remarks

Stamped Metal Parts for Electronic Unit

Interplex Electronics India Ltd

Bangalore, Karnataka

J.11011/21.99-IA II
dated July 22, 1999

The industry should ensure that the treated effluent and stack emissions from the unit are within the norms stipulated under the EPA rules or SPCB which ever is more stingent. In case of process disturbances/ failure of pollution control equipment adopted by the unit, the respective unit should be shut down and should not be shut down and should not be restarted until the control measures are rectified to ahieve the desired efficieny.

Foundry Unit

Indsil Industries Ltd

Coimbatore District, Tamil Nadu

J.11011/29/99-IA II
dated July 22, 1999

The emission of particulate matter from various process units should conform to the standards prescribed by the concerned authorities from time to time.

Modernization of Chior-Alkali Plant

Southern Petrochemical Industries Corporation Ltd

Manhali, Chennai

J.11011/20/99-IA II(I)
dated July 22, 1999

The Company must comply with the safeguards stipulated by the Ministry while granting environmental clearance to the Expansion/Modernization Project of Chlor-Alkali Pland vide its letter No. J.11011/16/97-IA.II(I) dated April 10, 1999

Hydro-treater Project for upgrading coker LGO to HSD

Bondaigaon Refinery and Petro-chemicals Ltd

Dddhalidaon, Bongaigaon, Assam

J.11011/4/99-IA II(I)
dated July 16, 1999

The Company must comply with the conditions and safeguards stipulated by the Ministry while granting environmental clearance to the refinery expansion project vide Ministry’s O.M. No. J.11011/24/90-IA.II(I) dated June 30, 1999

Foundry Unit

Veerapan Steels (P) Ltd

Salem District, Tamil Nadu

J.11011/48/98-IA II(I)
dated July 01, 1999

The emission of particulate matter from various process units should conform to the standards prescribed by the concerned authorities from time to time.

High Precision Bearings for I.C. Engines

Bimetal Bearings Ltd

Hosur, Tamil Nadu

J.11011/43/98-IA II
dated July 01, 1999

The industry should ensure that the treated effluent and stack emissions in the unit are within the norms stipulated under the EPA rules or SPCB whichever is more stringent. In case of process disturbances/failure of pollution control equipments adopted on the unit, the respecitve unit should be shut down and should not be restarted until the control measures are restified to achieve the desired efficiency.

LPG Bulk Unloading-cum-Bottling Plant

Indian Oil Corporation Ltd

Hope Town, A&N Islands

J.11011/11/96-IA-III
dated July 22, 1999

All constructions except pipeline shall be beyond 200 meters of the High Tide Line (HTL) on the landward side.

Expansion of Asbestos Cement and Accessories Manufacturing Unit

Premier Roofing Products Ltd

Gummidipoondi, Tamil Nadu

J.11011/31/98-IA II
dated August 12, 1999

The project proponent shall adhere to the prescribed BIS standards and laws regarding use and handling of asbestos, safely of employees’ etc.

Capacity Expansion of Cochin Refinery

Cochin Refineries Ltd

Ambalamugal Ernakulam District, Kerala

J.11011/1/99-IA II
dated July 16, 1999

The company should adhere to the stipulations made by MOEF vide O.M. No.J-11011/32/90-IA II dated August 20, 1991.

Expansion of Bulk Drug Unit

Astra-IDL Ltd

Bellary Road, Kattigenahalli village, Bangalore

J.11011/46/99-IA.II(I)
dated July 16, 1999

The gaseous emissions from the proess stacks and boilers etc must conform to the standards prescribed under the EPA rules and/or State Pollution Control Board.

Foundry Unit

Sakthi Sugars Ltd. Foundry Division

Erode District, Tamil Nadu

J.11011/3/99-IA II
dated July 08, 1999

The emissions of particulate matter, from various process units should conform to the standards prescribed by the concerned authorities from time to time.

1.4 MTPA Cement Plant

GKW Limited

Chittorgarh District, Rajasthan

J.11012/27/94-IA II(I)
dated July 09, 1999

The gaseous and particulate matter emissions frm various units should conform to the standards prescribed by the Central Govt. or State Pollution Control Board. At not time the particulate emissions should exceed to 50 mg/Nm3. Interlocking facility should be provided in the pollution control equipments so that in the event of pollution control equipment not working, the respective unit(s) shut down automatically.

Sector : Infrastructure Projects

Sl. No.

Name of Projects

Proponent

Location

Authority and Date of Approval

Remarks

1.

Rural Road Construction

Andaman Public Works Department, Port Blair

Havelock Island, Andaman

J-17011/29/98-IA-III
dated July 26, 1999

Specification of the road shall have minimum dimensions and it shall be a single track road only.

No excavation shall be done on seaward side of the proposed road.

2.

Road Bridgbe Construction

Public Works Department, West Bengal

Hawrah District, West Bengal

J-21012/6/98-IA-III dated August 02, 1999

Protective walls for protection of shoe areas on either side of the bridge shall be provided. This requirement shall be carefully assessed and necessary provision shall be made in proposal for providing suitable protective walls.

3.

Construction of a Hotel

Benito Resorts (P) Ltd

Mormugao Taluka, Goa

J-19011/12/96-IA-III dated July 12, 1999

There shall be no withdrawal of groundwater for the purpose of the project.

The project shall not be commissioned till the requisite quantity of water is made available by the PWD, Govt of Goa.

Sector : Hydro-electric Projects

Sl. No.

Name of Projects

Proponent

Location

Authority and Date of Approval

Remarks

1.

Parbati Hydro-electric Project, Stage-II (800 MW)

National Hydro-electric Power Corporation Ltd

Kullu District, Himachal Pradesh

J-12011/1/99-IA-I(RV)
dated July 12, 1999

The project authorities can build non-tarred roads in the projects areas.

The project authorities can also build temporary labour colonies in the project area subject to providing drinking water, sanitation, fuel required for the labourers etc.