Environmental Clearance


The information on the projects accorded environmental clearance is given below :

Sector : Mining Projects

Sl. No.

Name of Projects

Proponent

Location

Authority and Date of Approval

Remarks

1

Masonry Stone Mine

M/s Smt. Sudesh Mehta

Tehsil Alwar, District Alwar, Rajasthan

A-15011/9/99-IA.II(M) dated Jan 14, 2000

Drills should be operated either with water spraying arrangement or dust collector

Only controlled light charge blasting should be carried out with adequate safety precautions.

2

Masonry Stone Mine

M/s Pramod Kumar Jain

Tehsil Alwar, District Alwar, Rajasthan

A-15011/9/99-IA.II(M) dated Jan 14, 2000

Garland drain should be constructed around the ML area waste dump site to prevent run-off from the waste dump to arrest siltation

Personnel working in dusty areas should use dust mask.

3

Masonry Stone Mine

M/s Chandra Prakash Jain

Tehsil Alwar, District Alwar, Rajasthan

A-15011/9/99-IA.II(M) dated Jan 14, 2000

Top soil, if any, should be stacked separately and utilised for vegetation of reclaimed area.

OB and other wastes should be dumped at identified sites using proper techniques and precautions. Dumps, if any, should be reclaimed suitably.

4

Masonry Stone Mine

M/s Anshul Mehta

Tehsil Alwar, District Alwar, Rajasthan

A-15011/9/99-IA.II(M) dated Jan 14, 2000

The government of Rajasthan has been requested to constitute a District level Committee under the Chairmanship of District Collector, Alwar to ensure effective monitoring of the compliance of the environmental protection measures. Unless this is done, the proponent will not go ahead with the implementation of this project.

5

Masonry Stone Mine

M/s Vivek Tyagi

Tehsil Alwar, District Alwar, Rajasthan

A-15011/9/99-IA.II(M) dated Jan 13, 2000

Mining should be started from top of the hillock by making benches instead of starting from the bottom of the hill. Excavation should not go beyond the ground level.

The project authorities should obtain 'consent to operate' from the State Pollution Control Board before commencing work at site.

6

Masonry Stone Mine

M/s Navin Kumar Jain

Tehsil Alwar, District Alwar, Rajasthan

A-15011/9/99-IA.II(M) dated Jan 14, 2000

Project authority should scientifically reclaim / rehabilitate the mined out area in consultation with the Central Arid Zone Research Institute, Jodhpur. Plantation should also be raised on benches. Maintenance of plantation should be carried out till the crown of the trees is achieved above the grazing level.

7

Masonry Stone Mine

M/s Ajay Kumar Gupta

Tehsil Alwar, District Alwar, Rajasthan

A-15011/9/99-IA.II(M) dated Jan 14, 2000

Crushing operation should be carried out with adequate air pollution control measures.

8

Masonry Stone Mine

M/s Harlal Saini

Tehsil Alwar, District Alwar, Rajasthan

A-15011/9/99-IA.II(M) dated Jan 14, 2000

Top soil, if any, should be stacked separately and utilised for vegetation of reclaimed area.

OB and other wastes should be dumped at identified sites using proper techniques and precautions. Dumps, if any, should be reclaimed suitably.

9

Masonry Stone Mine

M/s Shri Ved Prakash Gupta

Tehsil Alwar, District Alwar, Rajasthan

A-15011/9/99-IA.II(M) dated Jan 14, 2000

The OB dumps if any, should not be kept active for long period. Inactive dumps should be reclaimed suitably and planted all over. Reclamation measures to stabilize the dumps should be adhered to.

Ambient air quality in the core zone for SPM, RPM, SO2 NOx and CO should be carried out once in six months in consultation with the State Pollution Control Board.

Sector : Miscellaneous Project

Sl. No.

Name of Projects

Proponent

Location

Authority and Date of Approval

Remarks

1.

Manufacturing facility of Bulk Drugs

M/s Vera Laboratories Ltd.

Vizianagaram, Andha Pradesh

J.11011/27/96-IA II (I)
dated Jan 25, 2000

The SPM and gaseous emissions from the various process units including Captive Power Plant should conform to the standards prescribed under Environment (Protection) Rules, 1986 or norms stipulated by the SPCB whichever is more stringent. At no time, the emission level should go beyond the stipulated standards. In the event of failure of pollution control system(s) adopted by the unit, the prospective unit should not be restarted until the control measures are rectified to achieve the desired efficiency.

2.

Expansion of Distillery Unit

M/s India Glycols Ltd.

Kashipur,
Uttar Pradesh

J.11011/48/99-IA II
dated Jan 20, 2000

The industry should ensure that the treated effluent and stack emissions from the unit are within the norms stipulated under the EPA rules or SPCB, whichever is more stringent. In case of process disturbances/failure of pollution control equipment adopted by the unit, the respective unit should be shut down and should not be restarted until the control measures are rectified to achieve the desired efficiency.

3.

Asbestos Gasket Manufacturing

M/s Perfect Circle Victor Ltd.

Mahalunge, Pune, Maharashtra

J.11011/59/99-IA II
dated Jan 20, 2000

The project proponent shall adhere to the prescribed BIS standards and laws regarding use and handling of asbestos, safety of employees etc.

4.

Construction of Mahindra Beach Resort

 

Varca Village of Sacete Taluka, Goa

J.19011/10/98-IA III
dated Jan 20, 2000

There shall be no withdrawal of groundwater for the purpose of the project.

The project shall not be commissioned till the requisite quantity of water is made available by the PWD, Government of Goa.