NOTIFICATION UNDER SECTION 3(1) AND SECTION 3(2)(v) OF THE ENVIRONMENT (PROTECTION) ACT, 1986 AND RULE 5(3)(d) OF ENVIRONMENT (PROTECTION) RULES, 1986, DECLARING COASTAL STRETCHES AS COASTAL REGULATION ZONE (CRZ) AND REGULATING ACTIVITIES IN THE CRZ.
And whereas all objections received have been duly considered by the Central Government:
Now, therefore in exercise of the powers conferred by Clause (d) of sub-rule (3) of Rule 5 of the Environment (Protection) Rules, 1986, and all other powers vesting in its behalf, the Central Government hereby declares the coastal stretches of seas, bays, estuaries, creeks, rivers and backwaters which are influenced by tidal action (in the landward side) upto 500 metres from the High Tide Line (HTL) and the land between the Low Tide Line (LTL) and the HTL as Coastal Regulation Zone and imposes with effect from the date of this Notification, the following restrictions on the setting up and expansion of industries operations or processes etc in the said Coastal Regulation Zone (CRZ). For purposes of this Notification, the High Tide Line (HTL) will be defined as the line upto which the highest high tide reaches at spring tides.
Note:- The distance from the High Tide Line (HTL) to which the proposed regulations will apply in the case of rivers creeks and backwaters may be modified on a case by case basis for reactions to be recorded while preparing the Coastal Zone Management Plans (referred to below); however, this distance shall not be less than 100 metre or the width of the creek, river or backwater whichever is less.
The following activities are declared as prohibited within the Coastal Regulation Zone, namely
(ii) manufacture or handling or storage or disposal of hazardous substances as specified in the Notifications of the Government of India in the Ministry of Environmental & Forest. No. S.O. 594(F) dated 28th July, 1989, S.O. 966(E) dated 27th November, 1989 and GSR 1037(E) dated 5th December, l ,1989;
(iii) Setting up and expansion of fish processing units including warehousing (excluding, hatchery and natural fish drying in permitted areas);
(iv) setting up and expansion of units mechanisms for disposal of waste and effluents, except facilities required for discharging, treated effluents into the water course with approval under the Water (Prevention and Control of Pollution) Act, 1974; and except for storm water drains:
(v) discharge of untreated wastes and effluents from industries cities or towns and other human settlements. Schemes shall be implemented by the concerned authorities for phasing out the existing practices, if any, within a reasonable time period not exceeding three years from the date of this notification;
(vi) dumping of city or town waste for the purposes of land filling or otherwise the existing practice, if any, shall be phased out within a reasonable time not exceeding three years from the date of this Notification;
(vii) dumping of ash or any wastes from thermal power stations;
(viii) land reclamation, bunding or disturbing the natural course of sea water with similar obstructions, except those required for control of coastal erosion and maintenance or clearing of waterways, channels and ports and for prevention of sandbars and also except for tidal regulators, storm water drains and structures for prevention of salinity increase and for sweet water recharge;
(ix) mining of lands, rocks and other substrata materials except those rare mineral not available outside the CRZ areas;
(x) harvesting or drawal of ground water and construction of mechanisms therefore within 200 m of HTL: in the 200 m to 500 m zone it shall be permitted only when done manually through ordinary wells for drinking, horticulture agriculture and fisheries;
(xi) construction activities in ecologically sensitive areas as specified in Annexure-I of this Notification;
(xii) any construction activity between the Low Tide Line and High Tide Line except facilities for carrying treated effluents and waste water discharges into the sea facilities for carrying sea water for cooling purposes. Oils gas and similar pipelines and facilities essential for activities permitted under this Notification; and
(xiii) dressing or altering of sand dunes hills, natural features including landscape changes for beautification, recreational and other such purpose, except as permissible under this Notification.
All other activities, except those prohibited in para 2 above, will be regulated as under:
(2) The following activities will require environmental clearance from the Ministry of Environment & Forests, Government of India, namely:-
(ii) Operational constructions for ports and harbours and light houses requiring water frontage; jetties wharves, quayst slipways etc. (Residential buildings & office buildings shall not come within the definition of operational activities except in very special cases and hence shall not normally be permitted in the CRZ);
(iii) Thermal power plants (only foreshore facilities for transport of raw materials facilities for in-take of cooling water and outfall for discharge of treated waste water cooling water); and
(iv) All other activities with investment exceeding rupees five crores.
(ii) Within the framework of such approved plans, all development and activities within the CRZ other than those covered in para 2 and para 3 (2) above shall be regulated by the State Government, Union Territory Administration or the local authority as the case may be in accordance with the guidelines given in Annexures-I and II of the Notification; and
iii) In the interim period till the Coastal Zone Management Plans mentioned in para 3(3)(i) above are prepared and approved, all developments and activities-within the CRZ shall not violate the provisions of this Notifications. State Governments and Union Territory Administrations shall ensure adherence to these regulations and violations, if any, shall be subject to the provisions of the Environment (Protection) Act, 1986.
The Ministry of Environment & Forests and the Government of State or Union Territory and such other authorities at the State or Union Territory levels, as may be designated for this purpose, shall be responsible for monitoring and enforcement of the provisions of this notification with in their respective Jurisdictions.
[N. K-15019/l/84-IA-III (Vol. II)
R. RAJAMANI, Secy.
Classification of Coastal Regulation Zone:
Category I (CRZ-I):
(ii) Area between the Low Tide Line and the High Tide Line.
Category-II (CRZ-II):
The areas that have already been developed upto or close to the shoreline. For this purpose, "developed area" is referred to as that area within the municipal limits or in other legally designated urban areas which is already substantially built up and which has been provided with drainage and approach roads and other infrastructural facilities, such as water supply and sewerage mains:
Category III (CRZ-III):
Areas that are relatively undisturbed and those which do not belong to either category-I or II. These will include coastal zone in the rural areas (developed and undeveloped) and also areas within Municipal limits or in other legally designated urban areas which are not substantially built up.
Category-IV (CRZ-IV):
Coastal stretches in the Andaman & Nicobar, Lakshadweep and small islands except those designated as CRZ-I, CRZ-II or CRZ-III.
Norms for Regulation of Activities.
6(2) The development or construction activities in different categories of CRZ areas shall be regulated by the concerned authorities at the State/Union Territory level, in accordance with the following norms
CRZ-I
No new construction shall be permitted within 500 metres of the High Tide Line. No construction activity, except as listed under 2(xii), will be permitted between the Low Tide Line and the High Tide Line.
CRZ-II
(ii) Reconstruction of the authorised buildings to be permitted subject with the existing FSI/FAR norms and without change in the existing use.
(iii) The design and construction of buildings shall be consistent with the surrounding landscape and local architectural style.
CRZ-III
(ii) Development of vacant plots between 200 and 500 metres of High Tide Line in designated areas of CRZ-III with prior approval of MEF permitted for construction of hotels/beach resorts for temporary occupation of tourists/visitors subject to the conditions as stipulated in the guidelines at Annexure-II
iii) construction/reconstruction of dwelling units between 200 and 500 metres of the High Tide Line permitted so long it is with in the ambit of traditional rights and customary uses such as existing fishing villages and goathans. Building permission for such construction/reconstruction will be subject to the conditions that the total number of dwelling units shall not be more than twice the number of existing units; total covered area on all floors shall not exceed 33 per cent of the plot size; the overall height of construction shall not exceed 9 metres and construction shall not be more than 2 floors (ground floor plus One floor).
(iv) Reconstruction/alterations of an existing authorised building permitted subject to (i) to (iii) above.
CRZ-IV
Andaman & Nicobar Islands:
ii) The buildings between 200 and 500 metres from the High Tide Line shall not have more than 2 floors (ground floor and 1st floor), the total covered area on all floors shall not be more than 50 per cent of the plot size and the total height of constructions shall not exceed 9 metres;
(iii) The design and construction of buildings shall be consistent with the surrounding landscape and local architectural style.
(iv) Corals and sand from the beaches and coastal waters shall not be used for construction and other purposes:
(v) Dredging and underwater blasting in and around coral formations shall not be permitted; and
(vi) However, in some of the islands, coastal stretches may also be classified into categories CRZ-I or II or III with the prior approval of Ministry of Environment and Forests and in such designated stretches, the appropriate regulations given for respective Categories shall apply.
(ii) The buildings within 500 metres from the HTL shall not have more than 2 floors (ground floor and 1st floor), the total covered area on all floors shall not be more than 50 per cent of the plot size and the total height of construction shall not exceed 9 metres;
(iii) The design and construction of buildings shall be consistent with the surrounding landscape and local architectural style.
(iv) Corals and sand from the beaches and coastal waters shall not be used for construction and other purposes;
(v) Dredging and underwater blasting in and around coral formations shall not be permitted; and
(vi) However, in some of the Islands, coastal stretches may also be classified into categories CRZ-I or II or III, with the prior approval of Ministry of Environment & Forests and in such designated stretches, the appropriate regulations given for respective Categories shall apply.
Lakshadweep and small Islands:
(ii) The buildings within 500 metres from the HTL shall not have more than 2 floors (ground floor and 1st floor), the total covered area on all floors shall not be more than 50 per cent of the plot size and the total height of construction shall not exceed 9 metres;
(iii) The design and construction of buildings shall be consistent with the surrounding landscape and local architectural style;
(iv) Corals and sand from the beaches and coastal waters, shall not be used for construction and other purposes.
(v) Dredging and under water blasting in and around lagoons and coral formations shall not be permitted; and
(vi) However, in some of the Islands, coastal stretches may also be classified into categories CRZ-I or II or III with prior approval of the Ministry of Environment & Forests. In such designated stretches the appropriate regulations given for respective categories shall apply.
GUIDELINES FOR DEVELOPMENT OF BEACH RESORTS/HOTELS IN THE DESIGNATED AREAS OF CRZ-III FOR TEMPORARY OCCUPATION OF TOURIST/VISITORS, WITH PRIOR APPROVAL OF THE MINISTRY OF ENVIRONMENT & FORESTS
(ii) The total plot size shall not be less than 0.4 hectares and the total covered area on all floors shall not exceed 33 per cent of the plot size i.e. the FSI shall not exceed 0.33. The open area shall be suitably landscaped with appropriate vegetal cover;
(iii) The construction shall be consistent with the surrounding landscape and local architectural style;
(iv) The overall height of construction upto the highest ridge of the roof, shall not exceed 9 metres and the construction shall not be more than 2 floors (ground floor plus one upper floor);
(v) Ground water shall not be tapped within 200 m of the HTL; within the 200 metre - 500 metre zone it can be tapped only with the concurrence of the Central/State Ground Water Board;
(vi) Extraction of sand, levelling or digging of sandy stretches except for structural foundation of building, swimming pool shall not be permitted within 500 metres of the High Tide Line;
(vii) The quality of treated effluents, solid wastes, emissions and noise levels etc. from the project area must conform to the standards laid down by the competent authorities including the Central/State Pollution Control Board and under the Environment (Protection) Act, 1986;
(viii) Necessary arrangements for the treatment of the effluents and solid wastes must be made. It must be ensured that the untreated effluents and solid wastes are not discharged into the water or on the beach; and no effluent/solid waste shall be discharged on the beach:
(ix) To allow public access to the beach, atleast a gap of 20 metres width shall be provided between any two hotels/beach resorts; and in no case shall gaps be less than 500 metres apart; and
(x) If the project involves diversion of forest land for non-forest purposes, clearance as required under the Forest (Conservation), Act, 1980 shall be obtained. The requirements of other Central and State Laws as applicable to the project shall be met with.
(xi) Approval of the State/Union Territory Tourism Department shall be obtained.
7(2) In ecologically sensitive areas (such as marine parks, mangroves, coral reefs, breeding and spawning grounds of fish, wildlife habitats and such other areas as may be notified by the Central/State Government/Union Territories) construction of beach resorts/hotels shall not be permitted.